Journal

Weekly progress timeline for JianDe's GSoC 2026 AGL Bluetooth Integration project.

Use this timeline to track weekly GSoC progress, evidence captured from the target image, and upcoming deliverables. The journal is intentionally practical: each entry should connect project decisions to commands, logs, or code that can be reviewed later.

Schedule

Evaluation milestones#

The midterm evaluation window is August 11, 2026 through August 15, 2026. The deadline is August 15, 2026 at 2:00 AM.

Aug 11-15, 2026

Contributor Midterm Evaluation

Upcoming midterm evaluation for the GSoC 2026 contributor.

Aug 11-15, 2026

Mentor Midterm Evaluation

Upcoming mentor evaluation for the same midterm window.

Bonding period

Reviewed the AGL Bluetooth project scope, studied the BlueZ and PipeWire direction, and prepared the documentation structure for the coding period.

Week 1

Established the documentation structure, Bluetooth architecture direction, and first BlueZ validation flows for AGL target hardware.

Setup Bluetooth connect and pairing UI

Run the GAP and A2DP checklists on hardware, capture BlueZ and PipeWire logs, and refine plugin-facing assumptions from real target behavior.

Midterm and final reports

Publish milestone reports after implementation evidence, validation logs, architecture notes, and mentor feedback are ready.